Century Pacific Agricultural Ventures, Inc.
Date of Project Completion: March 2015
Area of Application: Processing Area
SVG Project
Date of Project Completion: March 2012
Area of Application: Kitchen and Lounge
New Word Hotel
Date of Project Completion: September 2014
Area of Application: Kitchen Area
Manila Ocean Park
Areas Applied :
1. Handrails
2. Aquatic Facility Areas / Walkways
SPT (Phils) Clark (Small Precision Tool)
Product Supplied : Fibergrate
Areas Applied : Drainage
SunPower Electronics
Product Supplied : Fibergrate
Areas Applied : Waste Water Facility
Energy Development Corp.
Product Supplied : Fibergrate
Areas Applied : Cooling Tower Area
8 Campus Place
The first tower of 8 Campus Place a three tower office complex is now complete. The three interconnected buildings are being built at McKinley Hill Cyberpark in the Philippine capital city, Manila. The buildings are LEED-registered so the main focus in the project has been ensuring that environmental concerns were addressed and that the building is sustainable in the long term.
Net Lima Building Case Study
The first certified “BERDE” project in the Philippines. Chad Oppenheim is selected to design the country’s first green building. Net Lima is just one of the three towers that are under construction at the Net Metropolis. The building features a facade that serves as sunshade and glass curtain that minimizes solar heat gain.
Zuellig Building Case Study
The first platinum LEED building in the Philippines. The Zuellig Building, a new 33-story office tower, brings together a superb location, world class design and green technologies to become Metro Manila’s premier business address.
Net Square Building Case Study
Net Square has total of 22 floors and has an area size of 18,700 sqm. It is located in Fort Bonifacio Global City and is the second building of the premier office developer in the city. Waterproofing rectification works at the penthouse areas of the Net Square. We applied the product PU 55 Sealer in highly critical executive office area.